PROGRESS REPORT MISSION SAN XAVIER del BAC
April 21, 2011 Period: 2.18.11 – 4.21.11
SUBMITTED TO THE PATRONATO SAN XAVIER BY BOB VINT, ARCHITECT TUCSON, AZ
STABILIZATION: SACRISTY ARCADE Site Visits: 03.04.11, 03.17.10, 04.07.11 & 04.20.11
(A.1) 03.03.10 SITE MEETING (11:00 a.m., 65º,clear)
PRESENT: B. Vint, Architect; D. Morales, G.C.; MRB crew
[Sonny, Vince, Jorge, Santiago, Freddy, Alex]
WORK IN PROGRESS: Re-pointing of adobe Arcade and east wall of Mission beneath arcade with lime/ sand/nopal mortar.
DISCUSSED: Adobe piers have been stabilized to the p[oint of the springline of the arches. The arches are to be re-pointed with lime mortar and stabilized first, and then the area of wall above the arch. The arches have been well-shored in the interim. The arch and wall can be readily preserved in place, without having to be re-laid.
April 2011 Progress Report